What checks need to be done for the framework installation of container activity rooms
Add time:2025-03-07 13:06:16 From: Hits:743

Firstly, the foundation and partition walls around the installation site should be flat. The commonly used material is reinforced concrete, which can be more sturdy. Then stand upright and connect the frame with crossbeams. Afterwards, lay the flooring. If multiple layers of flooring are required, install roof trusses and panels after fixing the flooring, install doors and windows, pull vertical brackets and other components, and install the necessary hardware for matching sanitary ware.


Check the quality and safety of the frame installation of the container mobile house. As the container mobile house is a light steel structure, the installation process is similar to that of a heavy-duty steel structure factory. Each process of the mobile house will be covered by the next process during the construction process, so many parts cannot be inspected after completion.


In view of this, after the installation of the foundation of the mobile house is completed, carefully check whether each part is firmly connected, and ensure the quality and safety of the mobile house.